11-13-2023 07:28 PM
How can we get help for icx 7150 to turn on
Solved! Go to Solution.
11-15-2023 07:18 AM
Hi @Vasayasultan
Greetings!!!
Thank you for the detailed information you shared.
As you mentioned there are lights on the PWR and SYST, if there is an amber/orange light on the "SYST" and a green light on the "PWR" on the Switch (as it is in the below picture). Meaning the Switch is stuck in the boot mode.
Basically, due to the power outage/ power spike, the switch went to a state that we call ‘boot mode’ that is not able to boot up properly. This is the reason your RUCKUS ICX-7150-C12P Switch is unable to transmit power (PoE- Power over Ethernet) to the Access Points or on its ports.
Please follow the below steps to fix this issue:
We will try to reset the Switch as described below VIDEO:
1. Please try to disconnect from the Power outlet the ICX-7150 and reconnect.
2. Please try to press the reset button using a paper click or a small stick
Video link: https://www.youtube.com/watch?v=6jHMTdo_hK4
IF THE RESET IS NOT WORKING, PLEASE TRY TO RESET YOUR SWITCH MULTIPLE TIMES (Like 10-15 times) AS DESCRIBED ABOVE. As we have seen it working sometimes after trying multiple times in many cases. If the reset with a paperclip works, the SYST and PWR lights should turn GREEN.
IF RESET DOESN’T WORK: Please follow the below steps.
If the reset does not make any difference, we need to perform a software recovery since it can be that the image flash is corrupted in basic words the unit is not able to boot up properly and need re-install the image to boot up properly.
Below is the Guide and Video Link to perform the Software recovery process:
Please refer to the below guide and Video link:
Video Link: https://www.youtube.com/watch?v=Ql22blH_CGo
Please note, we must use ethernet cable (both ends RJ45 plugs) and USB to type C cable both together as described in steps 2 & 3 in the guide link.
Please let me know if you have any queries in this regard.
Thank you again for your patience.
Best regards,
Imran Sanadi
RUCKUS Lennar Home Community.
11-21-2023 12:00 PM
im confused between 8095g , and 8095h , in 2nd option
also putty what comand should i give to update
11-21-2023 12:12 PM
Hi @Vasayasultan
As explained in my Upgrade post, please use 8095g in place of 8095h and IGNORE 8080f. Directly upgrade to 8095g directly from your current version.
Please refer to my upgrade post carefully with 2nd option as everything is mentioned and let me know if you are stuck at any step.
Thank you again for your patience and understanding.
Best regards,
Imran Sanadi
RUCKUS Lennar Home Community.
11-21-2023 12:43 PM
i cant log in icx 7150 as super is not working how to by pass or boot in to secondary
11-21-2023 01:09 PM
Hi @Vasayasultan
Thank you for the response.
If you cannot login, you could please try to log in with Switch default credentials with the combination shown below:
Username: super
Password: sp-admin
Also, try different combinations as shown in the below screenshot:
If you want to copy the version/SPC code to the secondary partition please Enter the below commands in CLI for the same:
Note: Hit Enter to accept each command
enable
copy flash flash secondary
boot system flash secondary yes
Example:
VIDEO LINK AS REFERENCE: https://www.youtube.com/watch?v=Eem1IBgYaWc
ICX7150-24P Router>enable (hit enter to accept the command)
ICX7150-24P Router#copy flash flash secondary (hit enter to accept the command and wait: until the flash finished)
ICX7150-24P Router#boot system flash secondary yes (hit enter to accept the command: the switch will reboot)
Please let me know if you have any queries in this regard.
Thank you again for your patience and understanding.
Best regards,
Imran Sanadi
RUCKUS Lennar Home Community.
11-21-2023 08:25 PM
So successful update to 8095g
but same issue can’t login to switch
I tried all the user name and password provided
but I can connect to putty with console cable if I can create username and password through that way
what would be the commas to create one