ICX7150 does not get config of SZ

Mobotix_IT
New Contributor II

Hi guys,

in the vSZ 6.1.0.0.935 I have a Switch group and configured some VLANs and AAA settings for ICX7150 switches when I join new switches from the staging group they don´t get the configuration from the SG. When I alter the config of the SG only the new settings are configured on the switch. The configuration that existed before the join of the switch is not moved to the switch.

The connection to the smart zone should be correct because changes in the config or new configurations are moved to the switch but not the existing ones.

Regards,
Johannes

1 REPLY 1

syamantakomer
Community Admin
Community Admin

Hi Johannes,

I hope you are doing well.

This post seems blocked by the security filter. Sorry for the delay and inconvenience.

Just checking in if you got the solution or still looking for some help.


Syamantak Omer
Sr.Staff TSE | CWNA | CCNA | RCWA | RASZA | RICXI
RUCKUS Networks, CommScope!