05-04-2022 06:45 AM - edited 05-04-2022 10:23 PM
Hi guys,
in the vSZ 6.1.0.0.935 I have a Switch group and configured some VLANs and AAA settings for ICX7150 switches when I join new switches from the staging group they don´t get the configuration from the SG. When I alter the config of the SG only the new settings are configured on the switch. The configuration that existed before the join of the switch is not moved to the switch.
The connection to the smart zone should be correct because changes in the config or new configurations are moved to the switch but not the existing ones.
Regards,
Johannes