Hi everyone,
due to re-structuring our company we have to move the vSC Cluster with two nodes from one site to another.
The two nodes are virtual machines (VMWare).
The plan is:
- Shutdown one node (follower)
- perform a full backup with veeam at the "old" site
- Import the backup at the new site
- Restore the VM at the new site
- Start the restored node at the new site
- Change IP-Address of the restored node using CLI (connecting with VMWARE Concole)
- Connect to the other node using Web interface
- Change the cluster-IP Address of the restored node
Am I right with this procedure?
Or do we have to go another way?
Thank you in advance and kind regards from Germany
Markus