Looking to migrate multiple locations each with a ZD1100 to one vSmartZone hosted at a remote location. I find documentation on how to migrate within the same network from controller to controller, but nothing with specifics regarding multiple ZD1100s to a singular vSZ. System version of the vSZ is 3.2.1.0.163. ZD1100 system version is 9.8.3.0 build 14. APs include R300, R500, R700, as well as some ZF7982. Anyone performed this type of migration?