I have a network with 2 zone directors. Some of the aps are managed by one of two zone directors, other aps are managed by the second zone director.
But, I have 4 aps who are managed by a zone director, status connected, but on the second zone director are showed as approval pending.
How can I remove these approval pending status ?
Thanks