cancel
Showing results for 
Search instead for 
Did you mean: 

SCI Deployment with 2 Master nodes?

Greg_WiGuy
Contributor II

We're looking at redeploying our SCI onto new hardware and I was wondering if its possible to deploy it as 2 master nodes for GUI redundancy or if it's just Master + one or multiple Data Nodes only?

1 ACCEPTED SOLUTION

Vineet_nejwala
Moderator
Moderator

Hi @Greg_WiGuy 

The SCI setup can only have ONE Master node + n number of data nodes (a) as per total number of APs and (b) total incoming records.

Best Regards

Vineet

View solution in original post

2 REPLIES 2

Vineet_nejwala
Moderator
Moderator

Hi @Greg_WiGuy 

The SCI setup can only have ONE Master node + n number of data nodes (a) as per total number of APs and (b) total incoming records.

Best Regards

Vineet

Thank you for the feedback Vineet