How can I enable the uplink ports from the console
Hello,
Do you see any lights on the ports?If not, then please enter this command with the port you want to check:show inter ether x.x.x -affected port
Once you checked the port it should say UP, if it is down, please check that you set the right speed for the port, you can also change the speed like this:
Switch-to-AP(config)#inter ether 1/1/1Switch-to-AP(config-if-e1000-1/1/1)#speedspeed-duplex Set to 100g, 40g,25g, 10g, 5g, 2500, 1000, 100,10, half or fullSwitch-to-AP(config-if-e1000-1/1/1)#speed-duplex
The stack is also up the spout - one unit has no license on the ports now and several other issues would a restore of the config resolve these issues. Also sounds daft but cannot find a diagram of how to cable three icx7250 in a stack unit.
Hi no lights on the port and the port is “down” the switch that had the uplink now says it has no configuration and I have tried to reset it on the front panel and this does not work. Having applied an 8 port POD it thinks the speed is 1gb so it won’t stack but it reports 10000 ! I need to wipe this back to factory. Lots of other issues here too!
Hi Richl
Above since its mentioned 7250 firmware upgrade . Could you please confirm if issue started after upgrading the switch ?
If yes then could you help us with firmware which was on switch and firmware the switch was updated to.
Also what is the device you are trying to connect on the port ? Was it a working setup before ?
Thanks
Hi All was Fine before starting the upgrade apart from Unit 1 Missing From the Stack
Here is the Story of the Upgrade process:
This was an upgrade on a 3 Switch Stack using a Manifest File via our Brocade BNA Server using its TFTP Repository. The Stack had a Failed Unit over a year ago and the replacement sent was at a Higher Firmware so could not join the stack This would be Unit one
The Stack still had one Connection to the Network Via Unit 3 a POE Switch
Unit 2 still has all the Stack Config but only had 2 x 10GB PODS used for Stacking and cannot connect to the network
The Manifest was to Upgrade from 08.0.30hT211 to 08.0.80fT211 into the Secondary Flash
My connection was lost on Boot System Flash Secondary after seeing the Secondary 80Ft on Sho Flash Stack Units 2 and Stack Unit 3
The Upgrade went as follows:
Copy to unit 3
Sync Image to Unit 3 Flash
Download of ICX7250 Boot Signature Done
Load to Buffer – Automatic copy to Member Units: 3
Syncing Image to Flash
Boot Image Copy is done
Manifest Image download is complete please reload the system
Noted and Thanks for reverting.
Which was the unit that was swapped in the stack of three units ?
Which unit in the stack had a port issue ?
What is the port number that you have the concern with ?
Unit 1 failed and was not replaced into the stack as the Firmware of the sent unit was 09 x and it would not be excepted into the stack
Unit 3 is the one in the mess now
Unit 2 did not have a connection to the Network as it had only a 2 port POD license and as a unit it has the config still in place – I added a pod license for all 8 ports but the port is shown as down on ports 4 – 8
Unit 3 will not join a stack as it reports that one of the stacking ports is only 1gb but the command for speed says it’s 10gb
Given the issue is software and I took a backup saved to the BNA server before I touched it would a restore fix the issue . I saved the files as something that means something to me would they need renaming as something else before using?
Please log a ticket with the below link so that we will help you with further troubleshooting. Thanks
https://support.ruckuswireless.com/contact-us