Hey guys. I'm about to replace our current network switches (HPs) with brocade icx 7150 and I need your help.
Here is my scenario:
ICX 6430-48 (stack): this is the core or distribution switch (this is going to stay in place until I replace the access switches)
Port 2/1/33 is tagged in all vlans (2,3,5,7). (This goes to one of the new ICX 7150)
I configured port 1/1/24 on the new ICX 7150 as a tagged port on vlans 3,5,7,10 and untagged on vlan2. When I connected the cable port 2/1/33 on the 6430 changed its status to Blocking. I set spanning-tree 802-1w for all vlans on the icx 7150.
I believe I'm missing something in the stp configuration. I will be connecting more 7150s to the 6430, and the 7150's will connect to other 7150s so I have to make sure I understand how this work before replacing the other switches. I read something about spanning-tree 802-1w admin-p2pt-mac but I'm not sure if that is what I need.
Thanks in advance.