There are 6 models in my Virtual SmartZone controller (5.2.2.0.1563) which are list below.
Frimware version 3.6.2.0.695 ==> R700 and the total q'ty are 237 pcs
Firmware version 5.2.2.0.2069 ==> R500, R550, R600, R610,R650, T610 and the total q'ty is aroud 5,200 pcs
Recently we rebuild the VSz to active the IPV6 and there is a problem to migrate the R700 to the new build cluster.
For the R500,R550,R600,R610,R650 and T610, I can use switchover cluster command and success to migrate the AP to new VSz.
For R700 always fail to switchover no matter to migrate 1AP at a time or 1 batch in the same time.
Is there any step I missed before I start to migrate the R700?
Thanks
MIchael Chen