We have a ZoneDirector 1100 and 7363 APs, and would like to migrate the current configuration (e.g. retain dynamic PSKs, VLANs, SSIDs, etc.) to a brand new Virtual SmartZone with R650 APs setup. I figure that the best route would be migrating the ZoneDirector first to the vSZ, and then simply onboarding the R650s.
However, it looks like the firmware version of the ZoneDirector needs to be at least 9.13.x for the migration to be supported but the highest available update is 9.10.2.0 build 130.
Am I just out of luck here and can't migrate the ZoneDirector 1100? What are my options to minimize downtime and avoid having to start from scratch?