We have a zd 1100 and multitude of zf7372 aps on our network.
We would like to upgrade our environment to an on-prem virtual controller and R510 aps.
Can we setup progressively in parallel the new environment with the same ssids to ease the implementation instead of working weekends and to eliminate downtime then pull out the zd1100 and zf7372 aps?
Thanks,