<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: How to enable full 802.3bt power on 7150-C10ZP ports? in ICX Switches</title>
    <link>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81126#M5753</link>
    <description>&lt;P&gt;Hi Greg_WiGuy,&lt;/P&gt;&lt;P&gt;The PoH ports (i.e. 802.3bt) on the 7150-C10ZP are ports 7 and 8.&amp;nbsp; This can be seen in the Hardware Installation Guide: &lt;A href="https://docs.commscope.com/bundle/icx7150-installguide/page/GUID-98DBADCF-277F-4450-8A0B-58A4F9161799.html" target="_blank"&gt;https://docs.commscope.com/bundle/icx7150-installguide/page/GUID-98DBADCF-277F-4450-8A0B-58A4F9161799.html&lt;/A&gt;&lt;/P&gt;&lt;P&gt;Cheers,&lt;/P&gt;&lt;P&gt;Sunny&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Wed, 12 Jun 2024 12:46:29 GMT</pubDate>
    <dc:creator>sunny_gupta</dc:creator>
    <dc:date>2024-06-12T12:46:29Z</dc:date>
    <item>
      <title>How to enable full 802.3bt power on 7150-C10ZP ports?</title>
      <link>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81122#M5752</link>
      <description>&lt;P&gt;We have a couple of these deployed supporting the R760 which is uplinked at 2.5Gbps.&amp;nbsp; Currently all APs are reporting that they are only connected to a 802.3at capable switch.&amp;nbsp; The datasheet for the ICX 7150 states that the 7150-C10ZP has 4x 802.3bt ready ports but I cant find any documents that get into the specifics for the 7150-C10ZP.&lt;/P&gt;&lt;P&gt;Which ports support 802.3bt and how do I enable it?&lt;/P&gt;&lt;P&gt;&lt;FONT face="courier new,courier"&gt;Power Capacity: Total is 240000 mWatts. Current Free is 92340 mWatts.&lt;/FONT&gt;&lt;/P&gt;&lt;P&gt;&lt;FONT face="courier new,courier"&gt;Power Allocations: Requests Honored 10 times&lt;/FONT&gt;&lt;/P&gt;&lt;P&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;Port Admin Oper ---Power(mWatts)--- PD Type PD Class Pri Fault/&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;State State Consumed Allocated Error&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;-----------------------------------------------------------------------------&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/1 On On 11400 29532 2P-IEEE Class 4 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/2 On On 11600 29532 2P-IEEE Class 4 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/3 On On 11000 29532 2P-IEEE Class 4 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/4 On On 11400 29532 2P-IEEE Class 4 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/5 On On 12600 29532 2P-IEEE Class 4 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/6 On Off 0 0 n/a n/a 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/7 On Off 0 0 n/a n/a 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/1/8 On Off 0 0 n/a n/a 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/2/1 On Off 0 0 n/a n/a 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;1/2/2 On Off 0 0 n/a n/a 3 n/a&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;-----------------------------------------------------------------------------&lt;/FONT&gt;&lt;BR /&gt;&lt;FONT face="courier new,courier"&gt;Total 58000 147660&lt;/FONT&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;When I try to set the inline power by class on any port, I get the following.&amp;nbsp; It's as if the switch doesn't support going past 802.3at power.&lt;/P&gt;&lt;P&gt;config-if-e1000-1/1/1)#inline power power-by-class 5&lt;BR /&gt;PoE Error: Please specify the class number in the range 1..4&lt;/P&gt;</description>
      <pubDate>Wed, 12 Jun 2024 12:07:23 GMT</pubDate>
      <guid>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81122#M5752</guid>
      <dc:creator>Greg_WiGuy</dc:creator>
      <dc:date>2024-06-12T12:07:23Z</dc:date>
    </item>
    <item>
      <title>Re: How to enable full 802.3bt power on 7150-C10ZP ports?</title>
      <link>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81126#M5753</link>
      <description>&lt;P&gt;Hi Greg_WiGuy,&lt;/P&gt;&lt;P&gt;The PoH ports (i.e. 802.3bt) on the 7150-C10ZP are ports 7 and 8.&amp;nbsp; This can be seen in the Hardware Installation Guide: &lt;A href="https://docs.commscope.com/bundle/icx7150-installguide/page/GUID-98DBADCF-277F-4450-8A0B-58A4F9161799.html" target="_blank"&gt;https://docs.commscope.com/bundle/icx7150-installguide/page/GUID-98DBADCF-277F-4450-8A0B-58A4F9161799.html&lt;/A&gt;&lt;/P&gt;&lt;P&gt;Cheers,&lt;/P&gt;&lt;P&gt;Sunny&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 12 Jun 2024 12:46:29 GMT</pubDate>
      <guid>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81126#M5753</guid>
      <dc:creator>sunny_gupta</dc:creator>
      <dc:date>2024-06-12T12:46:29Z</dc:date>
    </item>
    <item>
      <title>Re: How to enable full 802.3bt power on 7150-C10ZP ports?</title>
      <link>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81499#M5782</link>
      <description>&lt;P&gt;Thanks Sunny,&lt;BR /&gt;Its odd that the spec sheet says there are 4 full 802.3bt ports but the install guide only mentions two.&amp;nbsp; I'll report back here if we find out that those C1 and C2 ports are also .3bt capable.&lt;/P&gt;</description>
      <pubDate>Thu, 20 Jun 2024 13:11:36 GMT</pubDate>
      <guid>https://community.ruckuswireless.com/t5/ICX-Switches/How-to-enable-full-802-3bt-power-on-7150-C10ZP-ports/m-p/81499#M5782</guid>
      <dc:creator>Greg_WiGuy</dc:creator>
      <dc:date>2024-06-20T13:11:36Z</dc:date>
    </item>
  </channel>
</rss>

